HomeMy WebLinkAbout196CR39CORNER RECORD
Agency Index Wo
Document Number CR 9063
City of Kensington (APN 572-190-004) County of Contra Costa
Brief Legal Description Found monument near 5 Arlin
CORNER TYPE
Government Corner R Control 0
Meander 0 Property
-------t-------- --
N.
Elevation
n Lane
COORDINATES (Optional)
E,
/ Q
California
Units MetricEl U.S. Survey FootEl
Narrative of corner identified and monument as found, set, reset, replaced, or removed:
Z✓ See sheet #2 for description(s):
City monument referenced prior to pipeline construction per CR 7210, (154 CR 39). Monument was
checked on November 18, 2018 by an EBMUD survey crew, and found undisturbed and in good
condition. Reference points per CR 7210 were found as noted on Sheet 2.
Reference EBMUD Field Book 4535, Page 67(Wagner/Doring)
SURVEYOR'S STATEMENT
This Corner Record was prepared by me or under my direction in conformance with
the Professional Land Surveyors' Act on April 18, 2019
Signed `' l,�l-& r `. - _ P.L.S. or-R&-E.No:- 7263
1
COUNTY SURVEYOR'S STATEMENT
This Corner Record was received Avc�,,_ k
nor
and examined and filed ®(
SignedP.L.S. 4&r-R.G.E No. 6571
Title County Surveyor
County Surveyor's Comment
BPELSG-2016
Page 1 of 2
�O SAND SUR\
M. Mgyc2 �o-�3
*' NO. 7263 J*
P
\E OF CPO -r,/
LAND
es A.
L.S. 6571
Rancho
Lj Other Q
Horizontal Datum
Zone Epoch Date
Date of Survey
November 18, 2018
Vertical Datum
Complies with Public Resources Code §§8801-8819
Complies with Public Resources Code §§8890-8902
PLS Act Ref.: 0 8765(d)
08771
El 8773 0 Other:
Corner/ ❑X Left as found
Established
FIRebuilt 0 Pre -Construction
Monument: Found and tagged
Reestablished
Referenced 0 Post -Construction
Narrative of corner identified and monument as found, set, reset, replaced, or removed:
Z✓ See sheet #2 for description(s):
City monument referenced prior to pipeline construction per CR 7210, (154 CR 39). Monument was
checked on November 18, 2018 by an EBMUD survey crew, and found undisturbed and in good
condition. Reference points per CR 7210 were found as noted on Sheet 2.
Reference EBMUD Field Book 4535, Page 67(Wagner/Doring)
SURVEYOR'S STATEMENT
This Corner Record was prepared by me or under my direction in conformance with
the Professional Land Surveyors' Act on April 18, 2019
Signed `' l,�l-& r `. - _ P.L.S. or-R&-E.No:- 7263
1
COUNTY SURVEYOR'S STATEMENT
This Corner Record was received Avc�,,_ k
nor
and examined and filed ®(
SignedP.L.S. 4&r-R.G.E No. 6571
Title County Surveyor
County Surveyor's Comment
BPELSG-2016
Page 1 of 2
�O SAND SUR\
M. Mgyc2 �o-�3
*' NO. 7263 J*
P
\E OF CPO -r,/
LAND
es A.
L.S. 6571
BPELSG-2016 Page 2 of 2