Loading...
HomeMy WebLinkAbout196CR39CORNER RECORD Agency Index Wo Document Number CR 9063 City of Kensington (APN 572-190-004) County of Contra Costa Brief Legal Description Found monument near 5 Arlin CORNER TYPE Government Corner R Control 0 Meander 0 Property -------t-------- -- N. Elevation n Lane COORDINATES (Optional) E, / Q California Units MetricEl U.S. Survey FootEl Narrative of corner identified and monument as found, set, reset, replaced, or removed: Z✓ See sheet #2 for description(s): City monument referenced prior to pipeline construction per CR 7210, (154 CR 39). Monument was checked on November 18, 2018 by an EBMUD survey crew, and found undisturbed and in good condition. Reference points per CR 7210 were found as noted on Sheet 2. Reference EBMUD Field Book 4535, Page 67(Wagner/Doring) SURVEYOR'S STATEMENT This Corner Record was prepared by me or under my direction in conformance with the Professional Land Surveyors' Act on April 18, 2019 Signed `' l,�l-& r `. - _ P.L.S. or-R­&-E­.No:- 7263 1 COUNTY SURVEYOR'S STATEMENT This Corner Record was received Avc�,,_ k nor and examined and filed ®( SignedP.L.S. 4&r-R.G.E No. 6571 Title County Surveyor County Surveyor's Comment BPELSG-2016 Page 1 of 2 �O SAND SUR\ M. Mgyc2 �o-�3 *' NO. 7263 J* P \E OF CPO -r,/ LAND es A. L.S. 6571 Rancho Lj Other Q Horizontal Datum Zone Epoch Date Date of Survey November 18, 2018 Vertical Datum Complies with Public Resources Code §§8801-8819 Complies with Public Resources Code §§8890-8902 PLS Act Ref.: 0 8765(d) 08771 El 8773 0 Other: Corner/ ❑X Left as found Established FIRebuilt 0 Pre -Construction Monument: Found and tagged Reestablished Referenced 0 Post -Construction Narrative of corner identified and monument as found, set, reset, replaced, or removed: Z✓ See sheet #2 for description(s): City monument referenced prior to pipeline construction per CR 7210, (154 CR 39). Monument was checked on November 18, 2018 by an EBMUD survey crew, and found undisturbed and in good condition. Reference points per CR 7210 were found as noted on Sheet 2. Reference EBMUD Field Book 4535, Page 67(Wagner/Doring) SURVEYOR'S STATEMENT This Corner Record was prepared by me or under my direction in conformance with the Professional Land Surveyors' Act on April 18, 2019 Signed `' l,�l-& r `. - _ P.L.S. or-R­&-E­.No:- 7263 1 COUNTY SURVEYOR'S STATEMENT This Corner Record was received Avc�,,_ k nor and examined and filed ®( SignedP.L.S. 4&r-R.G.E No. 6571 Title County Surveyor County Surveyor's Comment BPELSG-2016 Page 1 of 2 �O SAND SUR\ M. Mgyc2 �o-�3 *' NO. 7263 J* P \E OF CPO -r,/ LAND es A. L.S. 6571 BPELSG-2016 Page 2 of 2